5 Things To Consider When Permitting a Building With a Change of Use

iStock 184278949

By Helen Callier, Contributing Writer

There are too many times to count where our PermitUsNow team members have answered the company’s 1.844.PERMIT.4 line, and the voice on the other side says, “I am having problems getting a permit.”  We ask the caller basic questions like the scope of work, location, type of use, and their city permitting project number.  The caller rattles off the scope, physical address, and then indicates the use of the building.  We then ask the caller, “What was this prior use of property?”  They respond, “It was a furniture store; and before, it was a residence.”  The conversation concludes with the caller advising they are building out a medical spa. 

This can be the cause of permitting woes as jurisdictions often require a full set of plans when a change of use is involved.  And while project owners are focused on location, doing so without understanding the impact of obtaining a site with a change of use can be and often is costly. 

So, what does change of use mean?  Basically, a change of use means when a building undergoes major remodel for another use or may incur no physical changes but has a change in type of business use.  For example, if the building was a residential property and is being converted for retail or if the building was a grocery store and is being converted into a school.  Both illustrate a different type of way the building will be used and as a result, must comply with the appropriate building codes and obtain a change of use permit. 

What is a change of use permit?  A change of use permit validates that the jurisdiction has reviewed and approved plans for the proposed use.  Approval signifies that the plans comply with applicable building codes.  Once approved, a change of use permit is issued, and construction work can start.  

If you’re a general contractor who has a building project involving a change of use, below are 5 things to consider with permitting. 

  • What is the current use of space versus the proposed use?  Answering this question will dictate how stringent the departmental reviews will be after submitting to the jurisdiction for a change of use permit.   Suggest meeting with a city plan reviewer early. 
  • Conduct a site visit with a contractor, key consultants, and if possible, with the project owner to assess the work to be done and what type of changes will be needed to meet code.  We have found that these changes are beyond what the project owner has thought about and a site visit helps minimize any surprises down-the-road. 
  • Do you have existing building plans?  Jurisdictions usually require a full set of plans when a change of use is involved.  If the project owner does not have plans, check with the landlord or property management.  If these options do not yield any drawings, then contact the jurisdiction to see if plans are in the archives.   
  • Taking buildings as-is?  If so, then another route to consider is going straight to occupancy to ask for an inspection.  After paying the inspection fee, city occupancy will schedule a site visit.  During this visit, inspectors will indicate what is needed to meet code and provide you with a written report.  You can then take this report (most of the time) and use it as a punch list to address all items that require fixing.  Once fixed, call for occupancy inspection again, and if approved, you are on your way to obtaining your certificate of occupancy and then are ready to open. 
  • Need help in obtaining change of use permitting?  Consider contacting a building permit expert who has experience in permitting projects that involve a different use.  Doing so can save time and money, plus alleviate frustrations with permitting. 

Change of use permits can be a pain and present challenges in obtaining approval.  The 5 things to consider are designed to get you to think and in doing so, develop an approach to minimize delays in permitting and starting construction.  I love helping businesses to open and the 1.844.PERMIT.4 line is open now to take your request on permitting your next project.  Visit permitusnow.com for all of our services.  #BuildSafe

Similar Posts

  • OSHA Vaccine Mandate Withdrawal Will Ease Sector’s Labor Challenges as Construction Firms Struggle To Reach Pre-Pandemic Job Levels

    FacebookXRedditPinterestEmailLinkedInWhatsApp By Subcontractors USA News Provider Construction employment in December remained below levels reached just before the start of the pandemic in more than half the states as firms struggled to find enough workers to hire, according to a new analysis of federal employment data released today by the Associated General Contractors of America. But…

  • The Small Business Center’s Role in Dallas’ Renovation Projects

    FacebookXRedditPinterestEmailLinkedInWhatsApp The Small Business Center in the City of Dallas plays a pivotal role in the city’s ambitious renovation projects, particularly in the revitalization efforts aimed at iconic landmarks like the Dallas Memorial Auditorium and the Black Academy of Arts and Letters. Tasked with overseeing the evaluation criteria for minority and women-owned business enterprises (M/WBEs),…

  • Tracking Jobsite Workers with Wearables Boosts Safety and Productivity

    FacebookXRedditPinterestEmailLinkedInWhatsApp If a worker fell on the jobsite, how fast would the operations and safety managers learn about the incident and be able to locate the worker to render assistance? When a construction company hires a subcontractor for a big job, does it always know if the sub has the promised number of crew members…

  • HCC Engineering Center of Excellence Names New Dean

    FacebookXRedditPinterestEmailLinkedInWhatsApp Dr. Mehmet Argin has been named Dean of HCC Engineering Center of Excellence after an exhaustive and highly competitive search.  Dr. Argin joined Houston Community College in 2017 as a full-time instructor in the Engineering COE. He served in the faculty senate and was a member of the 2018-19 cohort in the Chancellor’s Innovative…