5 Things To Consider When Permitting a Building With a Change of Use

iStock 184278949

By Helen Callier, Contributing Writer

There are too many times to count where our PermitUsNow team members have answered the company’s 1.844.PERMIT.4 line, and the voice on the other side says, “I am having problems getting a permit.”  We ask the caller basic questions like the scope of work, location, type of use, and their city permitting project number.  The caller rattles off the scope, physical address, and then indicates the use of the building.  We then ask the caller, “What was this prior use of property?”  They respond, “It was a furniture store; and before, it was a residence.”  The conversation concludes with the caller advising they are building out a medical spa. 

This can be the cause of permitting woes as jurisdictions often require a full set of plans when a change of use is involved.  And while project owners are focused on location, doing so without understanding the impact of obtaining a site with a change of use can be and often is costly. 

So, what does change of use mean?  Basically, a change of use means when a building undergoes major remodel for another use or may incur no physical changes but has a change in type of business use.  For example, if the building was a residential property and is being converted for retail or if the building was a grocery store and is being converted into a school.  Both illustrate a different type of way the building will be used and as a result, must comply with the appropriate building codes and obtain a change of use permit. 

What is a change of use permit?  A change of use permit validates that the jurisdiction has reviewed and approved plans for the proposed use.  Approval signifies that the plans comply with applicable building codes.  Once approved, a change of use permit is issued, and construction work can start.  

If you’re a general contractor who has a building project involving a change of use, below are 5 things to consider with permitting. 

  • What is the current use of space versus the proposed use?  Answering this question will dictate how stringent the departmental reviews will be after submitting to the jurisdiction for a change of use permit.   Suggest meeting with a city plan reviewer early. 
  • Conduct a site visit with a contractor, key consultants, and if possible, with the project owner to assess the work to be done and what type of changes will be needed to meet code.  We have found that these changes are beyond what the project owner has thought about and a site visit helps minimize any surprises down-the-road. 
  • Do you have existing building plans?  Jurisdictions usually require a full set of plans when a change of use is involved.  If the project owner does not have plans, check with the landlord or property management.  If these options do not yield any drawings, then contact the jurisdiction to see if plans are in the archives.   
  • Taking buildings as-is?  If so, then another route to consider is going straight to occupancy to ask for an inspection.  After paying the inspection fee, city occupancy will schedule a site visit.  During this visit, inspectors will indicate what is needed to meet code and provide you with a written report.  You can then take this report (most of the time) and use it as a punch list to address all items that require fixing.  Once fixed, call for occupancy inspection again, and if approved, you are on your way to obtaining your certificate of occupancy and then are ready to open. 
  • Need help in obtaining change of use permitting?  Consider contacting a building permit expert who has experience in permitting projects that involve a different use.  Doing so can save time and money, plus alleviate frustrations with permitting. 

Change of use permits can be a pain and present challenges in obtaining approval.  The 5 things to consider are designed to get you to think and in doing so, develop an approach to minimize delays in permitting and starting construction.  I love helping businesses to open and the 1.844.PERMIT.4 line is open now to take your request on permitting your next project.  Visit permitusnow.com for all of our services.  #BuildSafe

Similar Posts

  • Bush Airport Named A Top 5 Favorite Airport For Millennials

    FacebookXRedditPinterestEmailLinkedInWhatsApp By Subcontractors USA News Provider George Bush Intercontinental Airport has been voted a “Trazee Winner,” as a Top 5 Airport (North America) for Millennials, according to Trazee Travel, an online publication targeting millennials. Trazee Travel, a web and print publication created by Global Traveler’s parent company FXExpress Publications, Inc., targets the sought-after under-35 market….

  • Job Alert: Diesel Technician and Truck Driver Shortage Countrywide

    FacebookXRedditPinterestEmailLinkedInWhatsApp As the transportation industry continues to grow and baby boomers continue to retire, the need for trained diesel mechanics and truck drivers has never been greater. Job openings span the United States, and many sit open while businesses feel the stress of a massive talent shortage. For people seeking job security in a hands-on…

  • CPS Energy Takes Further Steps To Protect Customers From Excessive, Illegitimate and Illegal Prices

    FacebookXRedditPinterestEmailLinkedInWhatsApp By Subcontractors USA News Provider Recently, CPS Energy filed suit against the Electric Reliability Council of Texas (ERCOT) in Bexar County District Court to protect its customers from excessive, illegitimate and illegal prices. “CPS Energy is taking this action to defend its customers. Those who suffered the consequences of ERCOT’s failure must not be…

  • Port Houston Cargo Volume Off to Solid Start in 2017

    FacebookXRedditPinterestEmailLinkedInWhatsApp By Subcontractors USA News Provider “Cargo moving through Port Houston facilities is off to a solid start,” Executive Director Roger Guenther announced recently.  Terminals owned and operated by Port Houston handled a cumulative total of 5.7 million tons of cargo, reflecting a three percent increase compared to the same time last year. Year-to-date, Port…