Contractors: 5 Tips To Score a Building Permit in a Timely Manner

iStock 184278949

By Helen Callier, Subcontractors USA Contributing Writer 

Have you ever witnessed a kick-off return where the receiver ran 93 yards to score a touchdown?  This was the case for a rookie player on the Baltimore Ravens team at the opening of the 2020 NFL season, and there have been numerous other examples of this kind of feat through the years, including Billy “White Shoes” Johnson during the Luv Ya Blue Houston Oilers days in Texas.

A 45 to 60 seconds run to score a touchdown appears easy, but the truth is when looking behind the scenes, you’ll see it requires a lot of work. The players’ speed, agility, and abilities to avoid being tackled are attributed to preparation involving run routines, checking results of exercises, proper nutrition, mindset, and a host of other elements.  

This same thrill of a 90-yard run to a touchdown can occur when a contractor or architect goes through permitting without any rejections or delays.  And like the well-trained football player, the effort to obtain a permit requires upfront work.

Below are five tips to assist you in scoring a building permit in short order on your next project.

  • Suit up and start early, reviewing permitting steps during the planning phase.
  • Check to make sure all design plans are stamped, clearly signed and are for construction.  For smaller projects not requiring a licensed architect or engineer, make sure plans are drawn to scale, notations are clear, and plan adheres to jurisdiction’s standards (i.e. building codes, title block, etc.).
  • Pull the latest permitting checklist from the jurisdiction’s website to confirm meeting all requirements, including pre-requisite documents.
  • Contact jurisdiction plan reviewers to ask questions in advance, and request a pre-submittal meeting, if needed.
  • Package submittal per jurisdiction’s checklist for online or manual submission.  Complete permit application in full.

Following through with the above 5 tips can enhance your success in obtaining permits fast.  And as a contractor or architect, obtaining building permits per your construction schedule contributes to your financial success on projects and helps satisfy your customer’s project requirements.

“But Helen, you don’t realize the city’s online system is confusing… the jurisdiction uses an old IBC… the Plan Reviewer does not like me… I don’t have the time for permitting… and on and on.”  

The bottom line is that regardless of the condition of the playing field at the city, county, MUD, etc., if you follow the basics in the early stages of your project, your chances of running through the departmental reviews without a major tackle is achievable and repeatable.

In Conclusion

The PermitUsNow team receives a lot of phone calls and emails from contractors, architects, and project owners asking all sorts of questions about their permitting blockages. Regardless of what phase of programming, design, or construction the caller may be in, our technical staff filters permitting challenges through the lenses of the basics. The simple practices, like the five tips to score a permit in a timely manner, can help you win most of the time.


If you have a permitting story with tips of success, I’d love to hear from you.  I am the president of PermitUSNow, so connect with me at 1.844.PERMIT.4 or on LinkedIn.  #BuildSafe

Similar Posts

  • The Top 3 Secrets to Pulling Permits in Round Rock

    Breaking ground on your dream construction project in Round Rock, TX, is an exciting time. But before you can start building, you must have all the necessary permits. Pulling permits can be tricky, especially because every city has its specific set of building codes and regulations—and Round Rock is no exception. But we are here…

  • Five Secrets Revealed on How a Good Offense Helps to Obtain a Building Permit Fast

    With hundreds of billions of dollars and many more construction opportunities on the horizon for contractors, some jurisdictions are scrambling to handle the work load for plan reviews to issue building permits.  And with recent hurricane-impacted areas along the Florida Gulf Coast and in the Carolinas, jurisdictions will become even more stretched. For contractors with…

  • CPS Energy President & CEO Paula Gold-Williams Announces Early 2022 Departure

    By Dana C Sotoodeh, CPS Energy Contributor Recently, CPS Energy President & CEO, Paula Gold-Williams, has informed the Board of Trustees of her plans to leave the company in early 2022. Gold-Williams will work cooperatively with the Board of Trustees through this transition. “The Board of Trustees thanks Ms. Gold-Williams for her dedicated tenure as…

  • New Processors Make Edge AI More Accessible While Cutting Power Consumption in Half 

    Expanding on its history of delivering highly integrated processors, Texas Instruments  (TI) recently introduced new Sitara™ AM62 processors that help expand edge artificial intelligence (AI) processing into next-generation applications. The low-power design of the new processors enables support for dual-screen displays and small-size human-machine interface (HMI) applications.  The next generation of HMI will bring new…