5 Permitting Tips for Public Works Contractors

Pics 80

By Helen Callier, Contributing Writer  

It is always a great feeling to sign a new contract.  Be it for a commercial or public project, the sound of hearing the words, “You have been awarded XYZ job” is sweet music.  This was apparent when I was recently picking up a package at the post office. A Contractor saw the PermitUsNow wrapped fleet truck and came over to ask the following question.

Contractor: “Do you pull permits for city road projects?”

PermitUsNow: “Yes, we do. How can I help you?”

Contractor: “We are doing some intersection saw cuts, installing new driveways and culverts; and the City gave us a violation notice the other day for not having the proper permits and mentioned something about trees.”

PermitUsNow: “What is your full project scope? Where is the project located? Do you have a copy of the violation?”

The above kind of scenario occurs often and the PermitUsNow team members are passionate about answering questions and providing insights to Contractors, Architects, and Project Owners even when we are in the field. 

Below are 5 permitting tips shared with the Public Works Contractor to assist him in getting back on track with construction.

· Review the contract to see if the City Engineer or contracted Civil Engineering firm has the responsibility to pull permits.

· Double check with City Public Works PM and let them know about violations plus steps to resolve.

· If the Contractor is responsible to pull permits including for impact to trees and ROW infrastructure like light poles, make sure to register with the jurisdiction which will require your Certificate of Insurance and bond information.

· Confirm the number of driveways, culverts, intersections, etc. based on the scope shown in the contract.

· Review project schedule to assess the phasing of permits and how long it will require street closure and sidewalk permits.  

Municipal roadway projects are often challenging, especially when work involves high traffic and busy city streets with complex utilities.  Contractors are advised to review the above 5 tips to minimize project delays and to avoid negatively impacting public travel.  With so much infrastructure work going on in many cities and upcoming bond work in the U.S, Contractors can call PermitUsNow at 1.844.PERMIT.4 for permitting assistance.

At PermitUsNow, we are committed to pulling permits for our Architect, Contractor, and Project Owner clients without delay, eliminating their frustrations with the permitting process. Plus, we make it easy for you to work with us. Simply: 1) Email us your plans, 2) Follow up on our feedback for any missing items, and 3) Let us get your permitting done for you. So, send us your plans today, and we’ll free you up to focus on doing what you love – building your customers’ dreams.  

Visit us on the web at permitusnow.com. 

#BuildCustomersDreams #BuildSafe

Similar Posts

  • DOD will start requiring contractors to meet cybersecurity standards next month

    The Department of Defense (DOD) will roll out its Cybersecurity Maturity Model Certification (CMMC) in January 2020 so that it can ensure contractors on government projects have the necessary cybersecurity practices in place to protect the controlled unclassified information (CUI) to which they are privy. The type of information the DOD is trying to protect includes data…

  • Why an Attorney is your friend?

    By: Nathan Estrada First, you may be asking yourself, “How can an attorney be my friend?” A valid question. Second, you may be thinking of the stigma that can be associated with having an attorney. However, an attorney’s job is to protect you and your rights, as well as your business. The road of business…

  • WSP USA to join Texas Bullet Train team

    WSP has a long history in Texas, including recent infrastructure projects in Dallas, Houston Texas Central announced today that WSP USA is joining the Bullet Train team to provide engineering support as the project moves ahead in its pre-construction phase. Texas Central, developers of the high-speed passenger train between North Texas and Houston, cited WSP’s award-winning…

  • Mastering the Building Permit Process: Tips for Project Owners Handling Multiple Projects

    When managing multiple construction projects, navigating the building permit process efficiently is crucial for project owners. This blog will provide valuable insights and practical tips to help project owners master the building permit process and ensure timely approvals. Establishing a Streamlined Permitting Workflow Managing multiple projects simultaneously can be overwhelming, but project owners can streamline…