RRC Grants Waivers, Takes Actions to Speed Hurricane Harvey Recovery

iStock 625987632 e1505236432672
The Railroad Commission of Texas (RRC) today announced several actions to speed recovery from the impacts of Hurricane Harvey. These actions will permit energy industry operators under RRC jurisdiction to focus on restoring operations as quickly as possible without compromising public safety and environmental protection.
Among the actions taken by the RRC:
  • Temporary administrative filing and reporting options for oil and gas operators impacted by Hurricane Harvey – The RRC’s P-5 Financial Assurance Department will delay severances for Form P-5 Organization Reports due Sept. 1, 2017 and Oct. 1, 2017. Rather than issuing severances for delinquent Form P-5 after the normal requirement of 30 days, the department will issue severances 60 days after the Form P-5 due date. Additionally, Rule 15 inactive well requirements, as well as all other administrative filings or reports will be handled on a case-by-case basis.
  • Waivers permitting pipeline operators to use out-of-state personnel to participate in emergency response operations resulting from Hurricane Harvey – These waivers will be granted by the RRC on a case-by-case basis, for a period not to exceed 30 days, with possible extensions. The RRC enforces rules addressing operator qualifications established by the Pipeline and Hazardous Material Safety Administration (PHMSA). PHMSA agrees with RRC action. Pipeline operators granted this waiver are required to track the covered tasks and locations performed by any non-qualified and/or other assigned personnel (including out-of-state) for the duration of the waiver.
  • Waiver of certain licensing requirements for liquified petroleum gas (LP-gas) activities, employee certifications and vehicle operations – This is a blanket waiver granted by the Governor of Texas at the request of the RRC. This waiver temporarily reduces the regulations for operation of some LP-gas containers and system activities, certifications required for LP-gas workers and vehicles transporting LP-gas. Where applicable, licensing, certification and inspection requirements in an employee or vehicle’s home state must be met. Written notice to the Commission is required prior to any entity acting under this waiver.
Chairman Christi Craddick said, “As Texans recover from the devastation of Hurricane Harvey, partnerships across all levels of government are assisting with critical recovery processes. In an effort to provide relief to our state’s energy industry and help to speed up recovery operations in the energy sector, the Railroad Commission is taking action to extend deadlines on administrative paperwork and temporarily waive requirements while operators focus on safely getting oil and gas production back online. Texans are showing extraordinary resilience through this exceptionally difficult time, and the Railroad Commission is doing its part to support a strong recovery for our state.”
Commissioner Ryan Sitton said, “Hurricane Harvey has been devastating, and I remain concerned for the safety of our friends and families in impacted communities all across Texas in the wake of this storm. As Texas continues rescue efforts and begins recovery, the Railroad Commission acknowledges the challenge operators face with regulatory filings, and are extending deadlines to provide relief. Our number one priority is public and environmental safety, and we continue to require operators to report spills, leaks or other incidents. I am incredibly proud of how Texans have come together to help one another and so appreciative of the efforts of Governor Abbott, members of Congress and the federal government agencies responding to this catastrophe.”
Commissioner Wayne Christian said, “From rescue operations in flooded neighborhoods to providing warm meals for those displaced, Texans have stepped up and provided for their friends, neighbors, and even strangers during this time of great need. As Texans continue to come together and rebuild in aftermath of Hurricane Harvey, the last thing we want anyone to have to worry about is late paperwork. I am proud to support this common-sense measure to provide relief to operators that have been impacted by this hurricane.”
For additional information, please visit the RRC’s Hurricane Harvey Response page here.

Similar Posts

  • STUDY: Texans want to ride the high-speed train!

    FacebookXRedditPinterestEmailLinkedInWhatsAppAs the Texas high-speed train moves closer to construction, demand is accelerating at high speeds, according to a recent comprehensive study of the entire alignment – the most comprehensive review ever conducted of the travel market between Houston and North Texas. As an investor-owned project, decisions are based on data, and Texas Central engaged one…

  • PERMIAN BASIN: GROWTH ON THE HORIZON

    FacebookXRedditPinterestEmailLinkedInWhatsAppFor decades, the Ghawar field in Saudia Arabia stood alone as the most productive energy resource on the global stage – a behemoth of energy supplying much of the world’s demand. This year, though, marked an unprecedented shakeup in the energy ranking with a resurgent Permian Basin outpacing Ghawar in production. The Permian Basin –…

  • Railroad Commission Launches Texas’ First Online Searchable Database of Oil & Gas Inspection and Enforcement Data

    FacebookXRedditPinterestEmailLinkedInWhatsAppThe Railroad Commission of Texas launched its RRC Online Inspection Lookup (OIL) tool for searching statewide oil and gas inspection and enforcement information, including notices of violation and intentions to sever leases. For the first time in RRC history, RRC OIL allows anyone, anywhere at any time to search online records of oil and gas…

  • Texas Gained 3,200 Upstream Oil and Natural Gas Jobs in December, 50% of Jobs Recovered

    FacebookXRedditPinterestEmailLinkedInWhatsAppAUSTIN – Upstream* oil and natural gas employment rebounded with a 3,200 job gain in December, offsetting the 300 job drop in November, according to data from the Texas Workforce Commission. Texas has recovered 50% of jobs lost between the high point in employment in December 2014 and the low point in September 2016. Since the…

  • Railroad Commission of Texas News: RRC Begins Implementing Legislative Bill to Bring Rate Relief to Customers of State’s Natural Gas Utilities

    FacebookXRedditPinterestEmailLinkedInWhatsApp Relief is on the way for customers of the state’s gas utilities who were facing potentially high gas bills resulting from Winter Storm Uri. On June 16, Governor Greg Abbott signed House Bill 1520, which directs the RRC and the Texas Public Finance Authority to work together to issue customer rate-relief bonds, the proceeds…